Facility non-emergency
Request service or report a non-emergency issue in a VCU building.
Facility emergency
Call the 24/7 Operations Center at (804) 828-9444 to report a VCU facility emergency.
Planning, design, construction or renovation
Submit a project request.
Space request
Request new space, a function change or a space reassignment.
Announcements
West Grace Street Housing Project demolition and construction
Work will cause traffic and pedestrian access impacts throughout the project, with activities generally occurring between sunrise and sunset.
- June 29 – July 17, 7 p.m. – 7 a.m,
- Crosswalk closed at the corner of N. Belvidere St. and W. Grace St. (crossing W. Grace St.).
- Two right southbound lanes closed on N. Belvidere St. between the alley next to the ICA and W. Grace Street.
- Westbound lane on W. Grace St. closed between N. Belvidere St. and N. Laurel St.
- Eastbound traffic on W. Grace St. will not be impacted. Detour signage will be posted.
- July 17 – July 3, 7 p.m. – 7 a.m.
- One southbound lane closed on N. Belvidere St. between the alley next to the ICA and W. Grace St.
- August 1 – August 7, 7 p.m. – 7 a.m.
- Crosswalk closed at the corner of W. Grace St. and N. Belvidere St. (crossing Belvidere).
- Additional northbound lane on N. Belvidere St. closed, in addition to the existing lane closure for the CoStar Center for the Arts and Innovation construction
Lane and sidewalk closures on Broad and Belvidere
Due to construction of the CoStar Center for the Arts and Innovation, one northbound lane and the sidewalk on N. Belvidere St. between W. Grace St. and W. Broad St. as well as one eastbound lane and the sidewalk on W. Broad St. between N. Belvidere St. and N. Henry St. will be closed until construction is complete, which is anticipated by late 2027.
Helpful links
Apprenticeship program | Trimble Unity Construct (formerly eBuilder) account access | building managers | building manager/key control manager access changes form | construction and renovation bids | Facilities Self Service | FMS:Workplace | interactive campus map | ONE VCU Master Plan | PlanAXcess | space survey | Utility System Shutdown Request Form | VCU project permits
Capital construction projects
Athletic Village
The off-campus, four-phase Athletic Village will consist of new sports fields and facilities, including outdoor track facilities and practice fields, a tennis center, soccer stadium, and in door field house. It will return on-campus real estate to serve academic and student needs, reduce travel and increase team practice times, and offer new opportunities for community impact through youth programming.
CoStar Center for Arts and Innovation
Positioned on the southeast corner of Broad and Belvidere streets, across from the ICA at the Markel Center at VCU and steps away from Fortune 500 companies and local startups, a new CCAI will provide a launchpad for critical digital and creative economy initiatives both on campus and in the city. A new building will optimize VCU’s arts innovation programs by bringing them together under one roof.
VCU School of Dentistry
The proposed new School of Dentistry will provide state-of-the-art education, equipment and technology serving more than 500 students as well as maximizing care for more than 100,000 patients visits annually from across the Commonwealth, including underserved populations. It brings together general and specialty clinics, multiple cutting-edge academic laboratories, and associated contemporary support spaces.